ACRONIS Backup & Recovery 10 Server, Windows Guide de l'utilisateur Page 100

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 217
  • Table des matières
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 99
100 Copyright © Acronis, Inc., 2000-2010
3 Waiting At least one task is
waiting.
Otherwise, see 4.
Waiting for condition. This situation is quite normal, but
delaying a backup for too long is risky. The solution may be
to set the maximum delay or force the condition (tell the
user to log off, enable the required network connection.)
Waiting while another task locks the necessary resources. A
one-time waiting case may occur when a task start is
delayed or a task run lasts much longer than usual for some
particular reason and this way prevents another task from
starting. This situation is resolved automatically when the
obstructing task comes to an end. Consider stopping a task
if it hangs for too long to enable the next task to start.
Persistent task overlapping may result from an incorrectly
scheduled plan or plans. It makes sense to edit the plan in
this case.
4 Stopping At least one task is
stopping.
Otherwise, see 5.
No action is required.
5 Idle All the tasks are idle. No action is required.
Backup plan statuses
A backup plan can have one of the following statuses: Error; Warning; OK.
A backup plan status is derived from the results of the last run of the plans' tasks.
State How it is determined How to handle
1 Error At least one task has
failed.
Otherwise, see 2
Identify the failed tasks -> Check the tasks log to find out
the reason of the failure, then do one or more of the
following:
Remove the reason of the failure -> [optionally] Start
the failed task manually
Edit the local plan to prevent its future failure in case a
local plan has failed
Edit the backup policy on the management server in
case a centralized plan has failed
When creating a backup plan or policy the administrator
can turn on the option to stop executing the backup plan
as soon as the backup plan gets the Error status. The
backup plan's execution can be resumed using the Restart
button.
2 Warning At least one task has
succeeded with
warnings.
Otherwise, see 3.
View the log to read the warnings -> [optionally] Perform
actions to prevent the future warnings or failure.
3 OK All the tasks are
completed successfully.
No action is required. Note that a backup plan can be OK in
case none of the tasks has been started yet or some of the
tasks are stopped or being stopped. These situations are
considered as normal.
Vue de la page 99
1 2 ... 95 96 97 98 99 100 101 102 103 104 105 ... 216 217

Commentaires sur ces manuels

Pas de commentaire